HomeRoadmap

See what we’ve built since becoming one system, and where Niagara Transit is headed over the next decade.

Since becoming one system in 2023, we’ve made transit in Niagara simpler, more affordable, and more reliable. Here are some highlights from 2025.

10M+

trips delivered in 2025
$

3.50

one fare, anywhere

84

%
on-time performance, above the 81% peer average

27

new buses delivered
2025

One fare, anywhere

Replaced separate $6 regional and $3 local fares with a single $3.50 fare across every service, opening up the whole region to riders.

2025

Launched the Transit Benefit Pass

A $50 monthly pass for residents on Ontario Works, ODSP, or a low-income threshold. 5,176 passes sold in the first months, a 338% jump over the old discounted pass.

2025

Adopted our first 10-year Master Plan

Approved in principle in June 2025, our first long-term plan sets the framework for expanding transit across every community through 2035.

2025

Assessed 1,800+ bus stops for accessibility

Completed a system-wide review of every stop against provincial accessibility standards, guiding improvements under our Multi-Year Accessibility Plan.

2025

New service to Dain City

Rerouted the Port Colborne Link to bring hourly service to Dain City, connecting it to both Welland and Port Colborne.

2025

Eliminated radio dead zones

Improved tower coverage so operators and supervisors now stay in contact across the entire region, a real safety gain.

Our Facilities, Strategic Asset, and Service Network Master Plan is the roadmap for transit in Niagara from 2026 to 2035. It rolls out in three stages.

APPROVED IN PRINCIPLE, JUNE 2025

A decade of growth, connection, and faster trips

Built on feedback from hundreds of residents, the plan delivers more direct “one-seat” journeys, faster travel, more frequent service, Sunday and overnight service, and fewer specialized trip denials.

~$890M

10-year capital investment

187 → 345

fleet growth by 2035 (+84%)

25

%

faster average trips

5

rapid bus routes by 2035

Stage 1 · 2026–2027

Harmonize & Optimize

  • Service span 6 a.m. – midnight
  • Sunday service introduced
  • Express bus routes launch
  • Network optimization begins
  • Niagara Falls garage expansion starts
Stage 2 · 2028–2030

Build & Expand

  • Service span 5:30 a.m. – 1:30 a.m.
  • Rapid bus implementation
  • High-frequency network established
  • Major garage construction
  • Full fixed-route coverage achieved
Stage 3 · 2031–2035

Grow & Connect

  • Some overnight service
  • Complete rapid bus network (5 routes)
  • 25% microtransit increase
  • Garage expansions complete
  • Robust high-frequency urban networks

Alongside the Master Plan, we’re running focused studies to shape the system’s future.

Approved in principle

Facilities, Strategic Asset & Service Network Master Plan

Our comprehensive review of infrastructure, routes, and operations, developed with consultant Left Turn Right Turn, that produced the 10-year plan for transit across Niagara.

Status: Approved in principle, June 2025 · community awareness campaign underway

In progress

Fleet Electrification Strategy & Implementation Study

A phased plan to reduce greenhouse gas emissions by moving to electric vehicles and infrastructure, while protecting operational reliability and value for taxpayers. Developed with Alectra Energy Solutions over a 25-year horizon.

Status: Final report expected Winter/Spring 2026

Your feedback guides where we go next. Share your thoughts, follow along, or dig into the plans and reports behind our roadmap.

Secret Link