Faster, more frequent, more direct transit for every Niagara community from 2026 to 2035. Approved in principle on June 17, 2025.

person looking at phone on a bus

The Facilities, Strategic Asset and Service Network Master Plan is Niagara Transit’s first long-term plan since amalgamation. Developed with consultant Left Turn Right Turn, it examines our infrastructure, routes and operations to build the best possible network for the region’s needs over the next decade.

For the first time, it treats Niagara as one unified transit system rather than separate services stitched together, and it was shaped by feedback from hundreds of residents across three rounds of engagement.

Watch the plan explained

About five minutes. Turn on captions with the CC button in the player.

Niagara is on the move. Literally. Over the next ten years, we’re reimagining what public transit looks like across our entire region. I’m Carla from Niagara Transit, or NT to our friends.

— Hi there NT. — Hey NT. — Hello NT. — Hi Niagara Transit.

I’m here to tell you all about our Ten Year Transit Investment and Growth Strategy, also known as our master plan.

— Ten years, is that how long this video will take? — No, Ted, it’ll just be a couple minutes.

So what is the master plan? This plan is our playbook: a roadmap to roll out a ten-year investment and growth strategy to create a better, more connected transit system, with more buses, better hours, and fewer frustrated passengers.

— Good luck with that.

Our plan is happening in three stages, all designed to grow with Niagara responsibly and affordably.

— I like that!

Transit isn’t just about getting from point A to point B. It’s freedom, independence, it’s connection. It’s access to schools, jobs, health care, from all corners of our beautiful region.

— Sure, but what’s actually changing? — Glad you asked.

Stage one sets the path for 2026 to 2027. Here we start providing more frequent trips, starting earlier in the morning and ending later at night.

— Even on Sundays and holidays? — Even on Sundays and holidays. — Wow.

We’ll also be expanding our specialized transit to align with the Accessibility for Ontarians with Disabilities Act, and ensure everyone in Niagara can get to where they want to go, regardless of where they live or their level of ability. So we’re going to be adding new routes where we’ve never had routes before.

— So I could take the bus to get to Niagara-on-the-Lake? — That’s right, my friend. — Cool.

Reliability and accessibility is the goal, through smart investments to our infrastructure.

— Translation? — I can get where I need to go without owning a car, which helps my budget and the planet.

Stage two aims to be between 2028 and 2030. Here’s where we add more local community routes, and implement our first rapid bus lines.

— Rapid bus lines? — That means the bus routes go where you need to go faster and more frequently than they do today. — Cool. So I can get to class on time, and I can visit my family easier.

In this phase, we’ll begin our garage expansion for more buses.

— Ohh, I like that. — Then you’ll love what we have planned for stage three.

By the end of stage three, we will have increased our fleet from 187 vehicles to 345. We’ll be putting the finishing touches on our Niagara Falls garage expansion, and begin redeveloping and expanding the Welland garage.

— Be still my heart.

We’ll also be modernizing our transit hubs and introducing new Microtransit hubs across Niagara to make seamless connections between our services. All of this allows us to add overnight services and even more peak-time buses.

— Overnight service, that would have saved my bacon on night shifts.

As well, we’ll be acquiring a bigger, greener fleet.

— So a healthier Niagara.

This isn’t just about more buses. It’s about better service. By 2035, Niagara Transit will reach more residents of Niagara, especially those in rural or marginalized areas.

— Don’t let my cousin Jimmy know. He’s out in Wainfleet and I still owe him 20 bucks.

Our goal is to have 66% more service hours, a 240% service boost for most riders, a 1,400% service boost in marginalized areas, and 24% faster travel times.

— So it’s faster, greener and more affordable. That’s a win-win-win. I gotta admit, it sounds pretty good.

We’re jazzed about this plan because it’s more than getting from A to B. Transit is more than transportation. It’s the connective tissue of our community.

— It lets me get to my doctor’s appointments and run my errands on my own time. — It helps me get to school and all of our local festivals. — I can ditch my expensive car payments and save up for a home.

Transit is a sustainability and environmental program. It reduces greenhouse gas emissions, takes cars off the road and reduces congestion. Even if you aren’t riding the bus, you benefit from a good transit system. A strong transit system is the mark of a connected community, and dollar for dollar, good value. That’s why we’re asking for financial commitments from communities to pave the way for a more connected Niagara with Niagara Transit.

Hop on board. We’re going your way.

A major, staged investment in transit across the region over ten years.

The plan in numbers
By 2035
Total 10-year capital investment About $890 million
Fleet growth 84%, from 187 to 345 vehicles
Average trips 25% faster
Rapid bus routes 5
Where the investment goes
Capital
Fleet $251 million
Garages $275 million
Infrastructure $177 million

Every improvement is designed around one goal: making it easier to get where you’re going.

More one-seat journeys

Fewer transfers and more direct trips, so you get where you’re going with less hassle.

Faster trips

Average travel times drop by 25%, meaning less waiting and quicker journeys.

More frequent service

Higher frequency on busy routes, and new high-frequency networks in urban areas.

Fewer trip denials

More routes, more specialized service hours and better policies, so fewer trips are turned down for riders who depend on shared rides.

Sunday service and more

Service hours grow, starting with Sunday service from 6 a.m. to midnight. By 2035, some routes run overnight.

Better value

Investments focus on value, so every dollar adds lasting capacity to the network.

The plan rolls out in three stages, each building on the last.

Stage 1, 2026 to 2027

Harmonize and optimize

  • Service from 6 a.m. to midnight
  • Sunday service introduced
  • Express bus routes launch
  • Network optimization begins
  • Niagara Falls garage expansion starts

Stage 2, 2028 to 2030

Build and expand

  • Service from 5:30 a.m. to 1:30 a.m.
  • Rapid bus begins
  • High-frequency network established
  • Major garage construction
  • Full fixed-route coverage

Stage 3, 2031 to 2035

Grow and connect

  • Some overnight service
  • Complete rapid bus network (5 routes)
  • 25% more Microtransit
  • Garage expansions complete
  • Strong high-frequency urban networks

More service means a bigger fleet, and the facilities to keep it running.

Fleet growth: 187 to 345 vehicles

An 84% increase by 2035, to run more frequent service across more of the region.

Garage expansion: about $275 million

Niagara Falls gains room for 73 more vehicles, and Welland is rebuilt to add 72, so the growing fleet has somewhere to be stored and maintained.

The plan touches all 12 municipalities, each with its own stage-by-stage changes. Open your community’s one-page summary (PDF) to see what’s coming.

More than a year of study and three rounds of public engagement.

How the plan was made
When What happened
January 2024 After a competitive procurement, the study was awarded to Left Turn Right Turn, and work began the next month.
Spring 2024 Round 1, Today and Tomorrow: surveys and in-person pop-ups gathered residents’ views on transit today and their priorities for the future.
January to February 2025 Round 2, Exploring Possibilities: four network options for the next decade were shared for public review and feedback.
June 17, 2025 The Niagara Transit Commission approved the plan in principle, setting the direction for the next ten years.
August 2025 Round 3, Presenting the Plan: a community awareness campaign shared the final plan and what it means for each part of the region.

Heather Talbot, Manager of Integration and Transformation
1-833-678-5463, extension 271 · heather.talbot@niagaratransit.ca

Secret Link